Duke Floor Restoration Nashville Tn.
Home
Brick
Concrete
Marble
Natural Stone
Repair
Contact Us
Crack Before
Thor Helicals Imbeded
Thor Helicals Imbeded
Thor Helicals Imbeded
After
Before
After
Damaged Curb
Thor Helicals Drilled into Curb
Epoxy Repair
High Strength Fast Set
Overlayed and Completed
Before
Repaire Magnified
After
Demo and Rebuild
Installing
Installed
After Cleaned and Sealed
Damage
After
Before
After
Before
After
Brefore
After
Clolumn Damage
Clolumn Damage
Clolumn Damage
Rebuilding
After
Before
After
Stone Fireplace Damage
Repaired and Cleaned/Sealed
Repaired and Clean/Sealed
Before
After
Before
Install
After
Before
Afere
Before
After
Before
After
Limestone Bench Before
Limestone Bench Before
Limestone Bench Before
Limestone Bench Before
Epoxy Injection and repaired
Brick bed and gout failing.
Brick bed and grout failing. Brick cut out and bed repaired.
Repaired
Clean and sealed.
Sandstone bed failing along with grout.
Sandstone reset, bed repaired and grouted, cleaned and sealed
Before
After
Steal Footers Removal
Steal Footers Removal
Steal Footers Removal
Steal Footers Removal
Antique brick reset and grouted
Limestone Failing around Windows. Leaking Water and Air
After
Crack
Crack Cleaned
After
Before
After
Brick bed and Grout Failing
Brick Bed and Grout Failing
Brick Bed and Grout Failing
Removal of Bed and Concrete
New Concrete Bed
New Concrete Bed
New Concrete Bed
New Concrete Bed
Brick Laid Grouted Cleaned and Sealed
Travertine Crack
Travertine Crack Repair
Travertine Before
Travertine Repair After
Travertine Before
Travertine Repair After
Stone Steps Loose
Repaired like a Mason would leave it looking.
We Cleaned and aged the grout joints to make it look original.
Roof gutter brick damage.
Roof gutter brick repair.
Terrazzo Floor Cleaned.
Terrazzo Repair After
Terrazzo Floor Patched. Resurfaced and Sealed with a Satin Seal.
Failing limestone Arch
Limestone Arch was Replaced, Grouted and Supported from Backside.
Limestone Arch was Grouted and Supported from Backside
Broken Marble Top.
Marble Top, Epoxied and Polished.
Old Existing Brick Matched Up.
New Brick Matched up with Old Brick, Reset, and Aged.
Loose Ceramic Tile.
Ceramic Tile Reset.
Blue Stone with Rotten Grout Bed.
Blue Stone Reset, Cleaned, and Sealed.
Limestone Coping with Rotten Grout Bed.
Coping Reset, Cleaned, and Sealed.
Brick Bed and Grout Failing Before
Demo
After
Caulked and Sanded
Grout Removed and Stone Relayed Before
After
Before
After
Stamped concrete repair.
Stamped concrete repair.
Stamped concrete repair.
Stamped Concrete Repaired and Color Sealed
Damaged limestone column at St. Henrys.
Resurfaced and repaired damaged colum at St Henrys.
Old stained limestone columns at St. Henrys.
Resurfaced limestone columns at St. Henrys.
Blue stone steps popping off and in need of repair. Water migration is the cause of breakdown.
The bed was almost broken down completely.
Holes were drilled for more support, when relayed.
Prepped and sprayed with Hardener for strength and to prevent breakdown caused by water migration.
The Left has Hardener and cured for 12 hours or more, and the right side is without and is wet and crumbles.
Replaced, grouted, cleaned, and sealed.
Replaced, grouted, cleaned, and sealed.
Limestone tuck pointed all mortar joints, reset many stones, cleaned then sealed
Limestone tuck pointed all mortar joints, reset many stones, cleaned then sealed
Limestone tuck pointed all mortar joints, reset many stones, cleaned then sealed
Limestone tuck pointed all mortar joints, reset many stones, cleaned then sealed
Limestone step was not allowing water to drain off, it was 1 1/2 inches to high.
Step was ground to right level.
Step reset
Limestone tuck pointed all mortar joints, reset many stones, cleaned then sealed
Limestone tuck pointed all mortar joints, reset many stones, cleaned then sealed
Limestone tuck pointed all mortar joints, reset many stones, cleaned then sealed
Grout bed was rotten and removed.
Grout bed was rotten and removed.
Grout bed was rotten and removed.
Grout bed was rotten and removed.
New grout bed and leveled so that the water would drain off.
Limestone tuck pointed all mortar joints, reset many stones, cleaned then sealed
Limestone tuck pointed all mortar joints, reset many stones, cleaned then sealed
Limestone tuck pointed all mortar joints, reset many stones, cleaned then sealed
Before
After
Before
After
Before
After
Completed with Color Matching Concrete
Before
Bad Bed Romoved
Set and grouted
After
Before
Bad Bed and Grout Removal
Set and Leveled for Water Drainage
After
Bed Removal, Set, Grouted, Cleaned, and Sealed
Caulked and Sanded
Before
After
Before
After
Before
After
Before
After
Before
After
Before
After